Bible Quotes Trivia 1.0

3

Pro hodnocení programu se prosím nejprve přihlaste

Staženo
4 ×
How much do you really know about Bible Quotes and Sayings? Test your knowledge with our Bible Quotes Quiz App!
This quiz includes over 700 questions from easy to very difficult. Choose from general questions, Who said?, Fill the Blanks, and Which Book? categories.

Easy to use app! Choose category, start playing!
If you exit a quiz you can always resume where you left off!
You can also switch between the Trivia categories.

Please note, that internet connection is needed to play.
To make the app as small as possible (super fast download and less space on your device needed) we are hosting all questions for this Bible Quotes Trivia on our servers.

This is a FREE ad-supported application.
  • Verze programu

    1.0

  • Poslední aktualizace od vývojáře

    22. 11. 2017

  • Počet stažení za měsíc

    0 ×

  • Velikost

    2,4 MB

  • Potřeba instalace:

    Ano

  • Web autora

    fineapps2013

  • Podporované jazyky

    • Angličtina
Zobrazit více
Přejít do Google Play
Zdarma

Sdílet

TIP: Stahují se vám programy pomalu? Změřte si rychlost svého internetového připojení.