Oracle Primavera Field 19.6.6

3

Pro hodnocení programu se prosím nejprve přihlaste

Staženo
1 ×
Use the Oracle Primavera Field for iOS app to access critical information and provide status updates for the projects that your organization manages with Oracle Primavera. Streamline processes and reporting, identify and resolve issues quickly and effectively, collaborate with your team, and manage your project drawings with one easy to use app. Oracle Primavera Field for iOS supports offline access and provides the following capabilities:
• Create and communicate issues with ease using project drawings
• Conduct commissioning by scanning equipment barcodes, progressing workflows, tracking progress, and completing commissioning steps (iPad only)
• Create and complete inspections using existing project templates
• Bring BIM out of the office and into the field, providing a 3D model of your project as well as all the information you need to inspect and commission project equipment (iPad only)
• Add and track Issues, Inspections, RFIs, and progress photos from the iPad, and easily manage them in Oracle Primavera
• Sync all data back to Primavera for comprehensive project-wide reporting and metrics
Note: For full functionality, a current license and connection to Oracle Primavera are required.
  • Verze programu

    19.6.6

  • Poslední aktualizace od vývojáře

    13. 5. 2020

  • Počet stažení za měsíc

    1 ×

  • Velikost

    83,78 MB

  • Potřeba instalace:

    Ano

  • Web autora

    Oracle America, Inc.

  • Systémové požadavky

    Aplikace pro: iPhone, iPad

  • Podporované jazyky

    • Angličtina
    • ,
    • Čínština
    • ,
    • Francouzština
    • ,
    • Holandština
    • ,
    • Italština
    • ,
    • Japonština
    • ,
    • Korejština
    • ,
    • Němčina
    • ,
    • Portugalština
    • ,
    • Ruština
    • ,
    • Španělština
Zobrazit více
Přejít do App Store
Zdarma
Aplikace pro: iPhone, iPad

Sdílet

TIP: Stahují se vám programy pomalu? Změřte si rychlost svého internetového připojení.